On 20.09.1998 at the southern end of Platform 2 at Horsted Keynes there was a single semaphore signal.  Note there is no spur to Ardingly (just catch points) and no southern access to Platform 1.  A new northbound bracket signal is being installed for the Inner Home signal (there is no signal on the bracket).  The original incoming signal can just be seen to the right of the base of the water tower.  In the distance the southbound Advance Starter is Off for a departing train.  There is also no track to the dock on the left, the way being blocked by the concrete buildings.