General Inspector Practice Questions a) ½ to 1, measured from the top of the riser b) 1 to 1 ½, measured from the top of the riser c) ½ to 1, measured from the top of the sprinkler d) 1 to 1 ½, measured from the top of the sprinkler 14.How far above finished grade should sprinkler heads be positioned