Alena Thompson (Mechanical Engineer) joined the team and completed her 1st week helping with the Net-zero Communal Bathroom Designs. This week she researched the reservoir design, evaluated structural feasibility and suggested changes, started SolidWorks updates to the existing structure, and building the user interface for adapting structures to different size needs, as shown here.