Get a small tin pail, put holes in the bottom for drainage. Apply foundation - ready-made mortar on the outside. Next place the grid. Push it a little to the mix and place your stones evenly across the surface. When finished laying stones allow to dry completely (24 hrs). Next fill the holes between the stones with a grout mizture. Excess mixture after drying can be washed with a wet washcloth.