Dubai Frame, United Arab Emirates: The planned exhibition area covered the complete 90 m width between the two towers. The 24 inclined columns, each 7 m high, were formed with VARIO GT 24. PERI UP Modular Scaffolding was used as shoring for the MULTIFLEX Slab Formwork as well as access scaffold.